Muhammad Waqas Ali
About Me
Education
Cecos Univesity peshawar pakistan 2011
Electrical Engineer
Work & Experience
Field Modern Solution Con. Company (FMSCO) 11/02/2021 - 08/28/2025
Electrical Engineer
Overseeing construction activities related to MV network 33KV and LV network including Potable Water pumping station building, generator building, Sanitary pumping station, Sanitary lift station and industrial waste water pumping station. Managing Subcontractor works, including documentation, inspection of work done. a) Installation of medium voltage 1C x 500mm2 underground cable. b) Installation of medium voltage armored 3C x 240mm2 underground cable. c) Installation of Pad Mounted Transformers, USS. d) Installation of Ring Main Unit. e) Installation Of Standby Diesel Generator, ATS. f) Installation Street lighting poles and Underground cabling at Roads. g) Installation of Street Light Panels at Roads. h) Installation of lighting inside pump station building, Lighting Power Panels, IPP, ALP. I) Installation of Fire Alarm system. J) Installation of Instruments (PIT, ULIT, LS, PS, FIT,FLS). K) Installation of Remote Terminal Unit. L) Installation of Instrument Mounting Unit. M) Installation of Marshalling Rack. Testing & commissioning of Lighting, Lighting control panels & Power panels. Accumulating the all-equipment’s test reports for end user & Final closure for Handover.
Field Modern Solution Con. Company (FMSCO) 08/01/2018 - 09/30/2021
Lead Electrical Engineer
) Making comparison sheet for material approval. B) Finalizing material required as per Project specification with client. C) Supervision of installation of cable ladder for installing LV cables. D) Supervision of installation of supports for cable ladder. E) Supervision of fire alarm installation. F) Supervision of Aspirating smoke detector installation for panels G) Supervision of all Lightning work inside and outside substation including light poles. H) Supervision of MCC installation in substation. I) Supervision of VSD installation in substation. J) Supervision of underground cable installation. K) Supervision of Duct bank excavation and installation. L) Supervision of Junction Box installation for Pumps. M) Supervision of Local control station for Pumps. N) Installation of Radar Level Transmitter, Ultrasonic Level Transmitter, Pressure indictor transmitter, FIT. O) Installation of DDC for HVAC . Successfully handed over project along with documentations
FMSCO 03/14/2016 - 02/28/2018
Electrical Site Engineer
Underground piping for signaling cables 2). Underground cabling for street lighting. 3). Conduit piping for weighing scale 4). Installation of weighing scale 5.) Requesting RFI for material inspection and work inspection. 6). Installation of Street Light Poles. 7). Installation of Lights in loading shades
GHC International - LM & Co Pakistan 05/02/2011 - 02/06/2016
Electrical Site Engineer
Responsible for review of shop drawings and follow-up for site execution of electrical system, Such as Selection of Electrical components & installation requirements, Review of Electrical materials related to discipline and ensures its compliance with contract requirement. Responsible for formation of ducts for electrical wiring, Preparing RFI, Coordination with project consultant about progress, checking electrical subcontractor scope of work including Fire Alarm Installation, Public Address system installation of Nurse Call System, Main distribution board installation, lighting installation, lighting power panels and switches installation, Cable Tray Installation ,CCTV.